1.The brief description of baby food making line production equipment:
(1).Baby food machinery expertise in baby food, nutrition powder, instant drink mixes, instant fruit dessert.
Ability to handle a wide range of raw materials by simply varying the temperature, moisture and drying parameters.The raw materials can be a wide range of flours and starches, pure or blended, such as rice, soy, corn, oat, millet, wheat, sorghum, banana, cassava and potato.Various recipes are supplied, which can add vitamin, mineral and other nutritional substances to meet different nutritional requirements.
2. Raw materials: adopts cereals flour (corn, wheat, rice, oat, soy, etc)
3. Capacity: 150kg/h, 240kg/h, 500kg/h, 1000kg/hour
4. Flow chart: mixing system---Extrusion system---- -Drying system----Milling system---Packing system
5. Voltage: in China: Three phases: 380V/50Hz, Single phase: 220V/50Hz, we can make it according to customers' Local voltage according to different countries
6. Machines Materials: all the machines are made by stainless steel
7.The parameter:
Model |
SLG65 |
SLG70 |
SLG85 |
SLG95 |
Install Power |
75KW |
125KW |
220KW |
300KW |
Consumption Power |
52KW |
87.5KW |
144KW |
210KW |
Output |
120-150KG/H |
220-260KG/H |
500-600KG/H |
1000KG/H |
Dimension |
19000×1300×2200M |
22000×1300×2200M |
30000×1300×4500M |
40000×1300×5000M |
8.Our service:
Before sale services:
1.Provide the free consultation of the equipment.
2.Provide the standard device and the flow chart.
3. According to the clients' special requirement, offering the reasonable plan and free design helping to select the equipment.
1).Packaging: daub coal oil on the surface to protect the machine from moisture, Then cover with plastic film.Finaly pack them with wooden case.
2)Customer's requirement is available.
2).If you want to know the transportation cost: by air-please tell me your airport name; by express-please tell me your detailed address(including zip code,house number,street,city,country); by ship-pls tell me your delivery port.
Relevant spare parts |
free, delivery with processing line |
Guarantee |
Within 12 months |
Oversea service |
Provide installation and commissioning after machine arrived your factory |
Payment terms |
30% is paid by T/T as the down payment, 70% is paid by T/T orL/C before shipment. |
Delivery time |
30 days after receipt the deposit |
Pre-shipment |
When it finished, we will invite you to our company to inspect machines, when no problem, we will arrange the shipment |