China Produced Corn Puff Snack Food Extruder Manufacturing Machine Processing Line
1.Introduction of snacks extruder puff snacks production line:
China Produced Corn Puff Snack Food Extruder Manufacturing Machine Processing Line can be directly extruded from the extruder, dryer and flavoring machine. We can produce all kinds of snacks and different shapes by adjusting the dies from extruder. Snacks food line can take corn, rice, wheat, oat, rye and other grains as materials to produce extruded snacks, with crispy taste and lively shape Snacks food processing line is designed according to market demand.
2. Raw materials:
Corn, rice, wheat, oat, barley etc as ingredients.
3. Products:
Variety shapes are available for onion ring, fruit loops, coco loops, corn snacks, cheese balls, corn curls, corn sticks, coco pops, breakfast cereals, corn flakes, kurkure and pellets, etc.
4. Capacity: see below form.
Model |
SLG65 |
SLG70 |
SLG85 |
Install Power |
65KW |
110KW |
190KW |
Consumption Power |
42KW |
77KW |
133KW |
Output |
120-150KG/H |
220-260KG/H |
500-600KG/H |
Dimension |
19000×1300×2200M |
22000×1300×2200M |
30000×1300×2500M |
5. Flow chart:
Mixing system---Extrusion system---Drying system---Flavoring system---Packing system.
6. Voltage in China:
Three phases: 380V/50Hz, Single phase: 220V/50Hz, we can make it according to customers' Local voltage according to different countries.
7. Machines Materials:
All the puff snack food extruder machine are made by stainless steel, this line is with reasonable design and with high automation; the screws are made by alloy steel, with building block system structure and self-cleaning function.
Production introduction:
Sample:
Company introduction:
MOQ |
1 set |
Supply Ability |
20 sets per Month |
Shipping port |
Qingdao port, Shandong, China |
Packing details |
Fumigation-free wooden case outside, stretch film inner |
Relevant spare parts |
free, delivery with processing line |
Guarantee |
Within 12 months |
Oversea service |
Provide installation and commissioning after machine arrived your factory |
Payment terms |
30% is paid by T/T as the down payment, 70% is paid by T/T orL/C before shipment. |
Delivery time |
30 days after receipt the deposit |
Pre-shipment |
When it finished, we will invite you to our company to inspect machines, when no problem, we will arrange the shipment |